Southern Belt Road (2nd stage)

Section from Balaklavsky Prospect to Proletarsky prospect

Length of road section: 2.4 km
Length of an overpass along Varshavskoye highway: 0.3 km
Jughandle ramps: 1.1 km
Reconstruction of lateral passages at Varshavskoye highway: 1.1 km
Entry into operation: 2019