October 2020
Mo Tu We Th Fr Sa Su
28 29 30 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1
05 February 2014

New Project: Residential apartment complex with an underground parking (Sadovnicheskaya str., estate 57, buildings 1А, 2-8)

General Directorate Centre has won the tender for construction control over the Residential complex with an underground parking, located at: Sadovnicheskaya Str., estate 57, building 1А, 2, 3, 4, 5, 6, 7, 8" (luxury quarter "Wine House")" . Current works include restoration of facades and internal spaces, as well as installation of internal engineering systems for the 3-storey building of the warehouses of the “Partnership for distillery and warehouses for wine, alcohol, Russian and foreign wines” (Sadovnicheskaya Str.,estate 57, building 1), built in 1888-1889. The building will be further used for office and residential needs. The assignment provides maintenance of the historical architectural and artistic image of the building for the period of construction (including recreation of the lost architectural details). Ground floor of the building will contain administrative and technical premises, first and second floors - residential apartments, administrative and technical premises. Third floor will contain offices, and attic floor - more residential premises. Major technical and economic parameters: Total area: 6 568 square meters Number of floors: 3+attic+1 underground floor Number of apartments: 33 Number of parking spaces: 26 The planned period of putting the object into commissioning - 2-nd quarter of 2014. Also the plan includes construction of a new 3-7 storey square shaped building with 11 sections (Sadovnicheskaya Str., estate 57, building 1А, 2, 3, 4, 5, 6, 7, 8). The building will contain : 1 floor - entrances to the residential area and apart-hotel, non -food stores, pre-school educational institution, offices and public services; 2 floor - premises of apart-hotel, residential apartments, public services; 3 floor - premises of apart-hotel, residential apartments; 4-7 floors - residential apartments. Major technical and economic parameters: Total area: 48 866 square meters Number of floors: 3-7+2 underground Number of residential apartments: 160 Number of rooms in the apart-hotel: 4 Number of parking spaces: 420 Current stage of works - installation of wall in trench and other preliminary construction works. The planned period of commissioning - 2016.