November 2019
Mo Tu We Th Fr Sa Su
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1
03 June 2019

New objectT: Multifunctional complex residential development (Residential complex “Sobytiye”) at the address: Ramenky district, quarter 3 between Lobachevskogo Str. and Matveevskaya platform, 1, buildings 1, 2, 3

On May 25, 2019 General Directorate Center entered into an agreement with Limited liability company “Razvitiye” to perform the functions of a technical customer for the design and construction a multifunctional integrated residential development, located at Moscow, ZAO, Ramenky district, block 3 between ul. Lobachevsky and Matveevskaya platform, 1st stage, building 1, buildings 1, 2, 3. 

The project includes a business class residential complex with built-in non-residential premises and a two-level underground parking lot. It consists of three residential П-shaped buildings. The buildings consist of six 8-floor, three 10- floor, two 18- floor and four 25- floor sections. The composition is visually divided in two parts with different architectural solutions for the facades.

The project concept was developed by British architectural bureaus LDA Design and UHA Londo. It creates unique formats of apartments with lounge areas and frameless glazing, two-level apartments, apartments with terraces and penthouses on the upper floors. Apartments will have widescreen and panoramic windows. Height of the ceilings varies from 3.1 to 6.4 m. 

Total area of the buildings: 167 426 sq.m (for 3 buildings - 63 161 sq.m; 54 663 sq.m and 49 602 sq.m). The total number of apartments is 1036. Number of parking spaces - 790. 

First floors are intended for public premises: a supermarket, cafes, offices premises, and a kindergarten for 140 children.

The project also provides organization of additional transport services and landscaping of the local area. 

The planned completion date for the construction and commissioning of the facility is 2022.