Reconstruction of the street, including transfer of tram route and relocation of reversal ring

Aviatsionnaya str.

Road: 65,000 sq. m
Water Supply System: 1.2 km
Sewage System: 1.1 km
Water Drainage System: 2 km
2008: Completed