Проекты
Golovinskaya Traffic interchange

Address: Vodniy Stadion

Pathway: 0,6 km

Road: 50,000 square meters



Road and communications for further construction

Address: Kuntsevo, Quarter 18

Pathway: 0,6 km

Road: 35,000 square meters

Water Supply System: 2 km

Sewerage System: 1.8 km

Drainage System: 1.5 km

Completed in: 2010 (1st stage), 2012 (2nd stage)



Road (project passways 4668 and 6083) and engineering communications for further construction

Address:  Noviye Cheremushki, quarter 32А

Road: 48,000 square meters

Water Supply System: 1.8 km

Sewage System: 1.7 km

Drainage System: 2 km


Pressure culvert at Krasnoholmskaya embankment

Address: Shluzovaya embankment (4 items)



Engineering Communications for further construction

Address:  Vodniy Stadion, Dynamo

Collector: 1.5 km

Water Supply System: 2 km

Sewage System: 2.5 km

Drainage System: 1 km



Collector

Address: Leningradskoye shosse

Collector: 1.2 km

Water Supply System: 1.8 km



Collector

Address: Tagansky district (from Ustyinskiy Bridge to the Central Pumping station)

Length of collector: 2.5 km

Completed in: 2011



Deep-Laid Collector

 

Address: Bolshaya Dmitrovka str.

Completed in: 2000



Cabling layout works for construction (PKL, RTP)

Адрес: Akademika Koroleva str., estate 8

RTP: 1 unit

PKL: 25 km



Cabling layout works for construction (PKL, RTP)

Address: Pyrieva str.

RTP: 1 unit

PKL: 16 km



Cabling layout works (PKL, RTP)

Адрес: 4th Parkovaya str., estate 16

Electric cabling: 18 km

RTP: 1 unit



Covered crosswalk

Address: Bolshaya Yakimanka str. – Bolshaya Polyanka str.



Reconstruction of engineering communications

Address: Bolshaya Tatarskaya str. – Ozerkovsky pereulok.

Road: 20,000 square meters

Water Supply System: 1.6 km

Sewage System: 1.8 km

Water Drainage System: 1.5 km



Reconstruction of the street, including transfer of tram route and relocation of reversal ring

Address:  Aviatsionnaya str.

Road: 65,000 square meters

Water Supply System: 1.2 km

Sewage System: 1.1 km

Water Drainage System: 2 km



Reconstruction of engineering communications

Address: Bolshaya Ordynka str. 

Road: 28,000 square meters

Water Supply System: 1.6 km

Sewage System: 1.4 km

Water Drainage System: 1.2 km

Heating System: 1.2 km



Reconstruction of Kommisariatsky Bridge


Heating Supply system for the State Tretyakov Art Gallery

Collector: 0.5 km

Heating System: 0.6 km



Heating supply system for a construction project

Address: Schukino district, microdistrict 12

Heating System: 1.8 km



Underground collector

Address: Zemlyanoi Val str.



The Reconstruction of Lianozovsky Passage from Dmitrovsky Highway to the Cherepovets Street with the construction of the passage under Dmitrovsky Highway for building estate 9, North District

Gross Area: 1,065 m

Completed in: 2012



Reconstruction of Yaroslavvskoye highway (Moscow Ring Road to Sadovoye Ring)

Road area: 110 000 square meters

Water Supply system: 1,4 km

Gas supply system: 1,8 km

3 pedestrian crosswalks

To be completed in : 2013




Contacts

+7 (495) 694-1279

+7 (495) 694-1276

 info@gdcentr.ru

Map